The slightest depression can be a
problem for materials-handling equipment, but not for Con-Patch. Wash cavity clean, remove any loose material, allow area to dry
well, and then mix and apply Con-Patch. Press on trowel to
screed Con-Patch even with floor surface. Open to traffic in about 8 hours.